Bedford House on Park Street was the back office for the Debenhams store on North Street. It closed in January 2021. The store itself closed in May 2021.

The building, two linked office blocks built in 1965, already had approval to become 69 flats. Chestnut took the scheme on, improved it, and finished 73 apartments in 2024. Our changes included:

  • new glazing for better ventilation and fire protection;
  • Juliet balconies;
  • new fire safety measures in place of the old outside escape stair;
  • air source heat pumps instead of the old roof air conditioning;
  • a new on-site electricity substation.

Today

The Moxom is now 73 one and two bedroom apartments, all to let, on Park Street, close to Taunton town centre. They are let through McKinlays.

In 2024 the Bedford House development won Best Large Development, South West at the Compariqo Construction Awards.

Inside The Moxom

The flats are spread over two linked blocks, with the taller one rising to seven floors. Every flat has vinyl tile floors in the hall, kitchen and bathroom, solid oak-veneer doors, an intercom and a fully tiled bathroom. The building has two passenger lifts, a sprinkler system and on-site management. The larger two-bedroom flats also have a quartz worktop, built-in appliances and an en-suite.

The town centre is about 0.2 miles away. University Centre Somerset is 0.6 miles, Musgrove Park Hospital 0.7 miles and Somerset College of Arts and Technology 0.8 miles. Junction 25 of the M5 is 3.2 miles.

The story so far

  1. 1965 Bedford House is built as offices: two linked blocks on a 1.16-acre site.
  2. January 2021 The Debenhams offices at Bedford House close.
  3. September 2021 Approval is granted to convert the offices into 69 flats (prior approval, for turning offices into homes).
  4. 2023 Chestnut applies for changes, including Juliet balconies, better fire safety, and air source heat pumps in place of the old roof air conditioning.
  5. 2024 The conversion is finished. 73 apartments, all to let.
  6. 2024 The Bedford House development wins Best Large Development, South West, at the Compariqo Construction Awards 2024.
Register your interest

Hear first about The Moxom.

Leave your details and we will tell you when homes or shop units at The Moxom become available. We will only use your details for this, and you can ask us to remove them at any time.

  1. Send us a message here. It takes a minute.
  2. We reply with what is available at The Moxom, and the rent or price.
  3. You choose whether to book a viewing. There is no obligation.

I am interested in

More of our schemes